Road Closures

Sunday, September 23, 2018

Due to road construction in the area of the race start line, here is special race day traffic information. Please plan to arrive early. Roads will begin to close before 7:00 a.m.! A 6:30 arrival is recommended. Recommended parking is at the corner of WALTON and ADAMS, in the grassy lot by the OU Electronic Sign, with the best entrance to OU grounds via Adams Road. Walton/University traffic is expected to be heavy.  

 

Area 1: WALTON (Adams to Livernois) OLD PERCH (Walton to Avon)
Roads will close at 7:45 am and reopen as the last participant has turned off the road. All roads in this area will be reopened by 9:00 am.

Area 2: CLINTON RIVER/PAINT CREEK TRAILS AND DOWNTOWN ROCHESTER
The course travels to the Clinton River trail from Avon, exiting the trail at Elizabeth Street in Downtown Rochester, heading through downtown - Elizabeth/2nd Street to University, crossing Rochester Rd. to Pine Street into the duck pond area and north on the Paint Creek Trail.

Area 3: TIENKEN/BREWSTER/DUTTON
Area within race course will close at 8:30 am and reopen as the last runner is completely off the road, or at 12 noon, whichever comes first.

Area 4: ADAMS (Dutton to Oakland University Entrance)
Adams Rd. will be closed from Dutton to the entrance to Oakland University at Hillendale. After 9:00 am, once the runners have cleared Walton Blvd., northbound Adams traffic will be allowed to Walton, then will be directed Eastbound on Walton. Also, westbound Walton traffic east of Adams will be directed southbound on Adams for the duration of the event.